- Mon Jul 18, 2022 8:27 pm
#96251
If at least one task is done each day, sofcu23, that means there can't be a day where no work gets done (unlike every real construction project I've ever seen, where some days nothing gets done and nobody shows up to work). That's why setups like 3-0-2 or 3-2-0 are impossible. Every day there has to be something done.
Two days is possible, as long as at least one task is done on the first day and at least one task is done on the second day. Imagine, for example, that the first 4 tasks (FWTS) are all done on day 1, and the final task (P) is done on day 2. In that situation, the whole job was completed in two days, and there was something done on each of those days. There is no third day, so it's not a 3-2-0 distribution, but a 3-2 distribution!
Two days is possible, as long as at least one task is done on the first day and at least one task is done on the second day. Imagine, for example, that the first 4 tasks (FWTS) are all done on day 1, and the final task (P) is done on day 2. In that situation, the whole job was completed in two days, and there was something done on each of those days. There is no third day, so it's not a 3-2-0 distribution, but a 3-2 distribution!
Adam M. Tyson
PowerScore LSAT, GRE, ACT and SAT Instructor
Follow me on Twitter at https://twitter.com/LSATadam
PowerScore LSAT, GRE, ACT and SAT Instructor
Follow me on Twitter at https://twitter.com/LSATadam